| 1 |
Doha Port
Mina Cut |
Installation of Silt Curtains, Underwater
Cutting of Sheet piles. |
| 2 |
Doha Port
Sport Marine |
Dredging Works, Seabed Leveling with Core and
20mm, Installation of Precast Concrete Blocks,
Underwater Cutting of Piles, Installation of Pile
Jackets and Grouting Works. |
| 3 |
Doha Port
Sport Marine |
Installation of Floating Pontoos |
| 4 |
Kahrama RAF A3
Ras Abu Funtas
Station |
Under water inspection of 2 Intake Pipes (2.6KM per
pipe) and Video graphic Survey |
| 5 |
Doha Port
Mina Cut |
Intallation of underwater leveling layer, Installation of
precast concrete tiles, Underwater Videograhic Survey |
| 6 |
Doha Port
Mina Cut |
Supply & Installation Aton (Navigation Bouys) |
| 7 |
Doha Port
North Garden |
Dredging Works, Seabed Leveling with Core and 20mm,
Installation of Precast Concrete Blocks, Installation and
Removal of Silt Curtains. |
| 8 |
Doha Port
Halul |
Dredging Works, Seabed Leveling with Core and
20mm, Installation of Precast Concrete Blocks,
Installation and Removal of Silt Curtains. |
| 9 |
Doha Port
Diving Poo |
Underwater Videographic Survey of Seabed and Jet
Probing Inspection of Seabed for existing soft layer. |
| 10 |
COWI |
Carrying out deploy and retrieve an ADCP, Diving
Services |
| 11 |
Lusial Primary
Infrastructures
CP10-B1 |
Underwater & Above water Welding. Installation works for the
structural steel bearing plates & steel stiffener plates |
| 12 |
Doha Port -Halul |
Dredging Works, Seabed Leveling with Core and 20mm,
Installation of Precast Concrete Slabs for Slipway |
| 13 |
Mwani 4 Ports
Project |
Installation of Pontoons, Slipway, Laying of Geotextile,
Deployment of ADPC units, Diving assistance for
revetment and dredging survey works, Installation of
Silt Curtains, Placing of Rock Core and Gravel Layers |
| 14 |
Gewan Island
Marine Works |
Underwater Jet Probing, Seabed Survey, Installation of
silt curtain, Laying Geotextile, Diving Assistance for
revetment survey works, Installation of marker buoys
and Underwater Video graphic Survey |
| 15 |
Gewan Island
Marine Works |
Installation of Seabed leveling with gravel, Laying of
precast concrete pipe (1.8 Dia) |
| 16 |
Doha Port
Mina Cut |
Intallation of underwater leveling layer, Installation of
precast concrete tiles, Underwater Videograhic Survey |
| 17 |
Qetaifan Island
North Phase 1 |
Placing of Laying Geotextile, Diving Assistance for
revetment survey works, Revetment works and Armour
rock installation |
| 18 |
Qetaifan Island
North -Beach Club |
Placing of Laying Geotextile, Diving Assistance for
revetment survey works, Installation of marker buoys and
Underwater Video graphic Survey. |
| 19 |
Qetaifan Island
Icon Island |
Underwater Jet Probing, Seabed Survey, Installation
of silt curtain, Laying Geotextile, Diving Assistance
for revetment survey works, Installation of marker
buoys and Underwater Video graphic Survey. |
| 20 |
Removal of
Existing Jetty
Structure –Ras
Abu Aboud |
Underwater and Above water cutting of piles, removal of
existing jetty structure, Underwater Video graphic Survey. |
| 21 |
Doha Marriot
Gulf Hotel–Ras
Abu Aboud |
Installation of Core Rock, Amour materials |
| 22 |
Ras Aboud Waterfront
Promenade Project |
Installation of Core Rock, Amour materials, Installation of
Beach Sand.
Dredging Works, Rocks Works and Diving Services |
| 23 |
Al Wakra Port, Al Khor & Al
Ruwais Port |
Installation of Core Rock, Amour materials, Installation of
Beach Sand.
Dredging Works, Rocks Works and Diving Services |
| 24 |
Westway North Development |
Rock Works –Groyne |
| 25 |
Doha Port Sport Marina |
Installation of Floating Pontoons |
| 26 |
Doha Marriot Gulf Hotel |
Marine Building –Revetment Works |
| 27 |
Qetaifan Island –Waterpark Project |
Marine and Causeway (Installation of Rock Amour and Beach Sand). |
| 28 |
Qetaifan Island –Waterpark Project |
Marine and Causeway works for Master Blaster Area. |
| 29 |
Qetaifan Island –Waterpark Project |
Supply, Deliver and Installation of Floating Pontoons. |
| 30 |
Qetaifan Island –Waterpark Project |
Filling and Profiling of Beach Sand. |
| 31 |
Dock Terminals Upgrade Project |
Quay Wall and Diving Services |
| 32 |
Ras Abu Aboud Waterfront
Promenade Project –Site Instruction
No-1 |
Reclamation works, Placing of under Layer and Armour
Rocks (0.3 -1.0 ton), Placing of Beach Sand, Provision,
Installation & Maintenance of Silt Curtain. |
| 33 |
Infra structure work in Industrial
Area |
Excavation of Pumping Station |
| 34 |
Road & infra structure work in
Muaither |
Surface Water Network and TSE Trench Excavation |
| 35 |
Road & infra structure work in Al
Kharaitiyat & Izghawa |
Surface Water Network and TSE Trench Excavation. |
| 36 |
Gewan Island –Rock Lining of the
Lake |
Laying of Gravel base (Bedding) and Laying of stone
pitching rocks (Armour) |
| 37 |
Marine work at Amiri Yacht (Halul
Café) –Design & Built |
Installation of Core rocks, Armour rocks, Precast Concrete
Quay wall Blocks, Slipways & Floating |
| 38 |
BWS FIFA WC FIREWORKS |
Installation of Anchoring System, Steel Structure & Icon
Foundation and Installation with Diving services |